The new logistic center passed the final test
POSITIVE FINAL TEST FOR STOL – LE FROID
The new automatic warehouse installed by System Logistics for STOL – LE FROID in New Caledony, Coca-Cola and Carlsberg bottler, has successfully passed the final test.
The new automatic warehouse is composed of 4 double-depth stacker cranes, 19,7 m. high.
The total capacity is of 13.400 pallet locations, with a throughput of over 80 pallets shipped for hour.
The PPS picking system is able to handle 1.000 picking lines and 4.000 picking cases/hour.